ITEM 1. BUSINESS
General
(All Registrants)
PPL, headquartered in Allentown, Pennsylvania, is a utility holding company, incorporated in 1994. PPL, through its regulated utility subsidiaries, delivers electricity to customers in Pennsylvania, Kentucky, Virginia, and Rhode Island; delivers natural gas to customers in Kentucky and Rhode Island; and generates electricity from power plants in Kentucky.
PPL's principal subsidiaries at December 31, 2025 are shown below (* denotes a Registrant).
| PPL Corporation* | |||||||||||||||||||||||||||||||||||||||||||||||
PPL Capital Funding Provides financing for the operations of PPL and certain subsidiaries | |||||||||||||||||||||||||||||||||||||||||||||||
PPL Electric* Engages in the regulated transmission and distribution of electricity in Pennsylvania | LKE A holding company that owns regulated utility operations through its subsidiaries, LG&E and KU | RIE Engages in the regulated transmission, distribution and sale of electricity and regulated distribution and sale of natural gas in Rhode Island | |||||||||||||||||||||||||||||||||||||||||||||
Loading financial statements...
Financial statements
data from SEC XBRL filings. Values are as-reported; restatements supersede originals. Values reported in .
| Line item |
|---|
| Period ending |
Item 7. Combined Management's Discussion and Analysis of Financial Condition and Results of Operations
(All Registrants)
This "Item 7. Combined Management's Discussion and Analysis of Financial Condition and Results of Operations" is separately filed by PPL, PPL Electric, LG&E and KU. Information contained herein relating to any individual Registrant is filed by such Registrant solely on its own behalf, and no Registrant makes any representation as to information relating to any other Registrant. The specific Registrant to which disclosures are applicable is identified in parenthetical headings in italics above the applicable disclosure or within the applicable disclosure for each Registrant's related activities and disclosures. Within combined disclosures, amounts are disclosed for individual Registrants when significant.
The following should be read in conjunction with the Registrants' Consolidated Financial Statements and the accompanying Notes. Capitalized terms and abbreviations are defined in the glossary. Dollars are in millions, except per share data, unless otherwise noted.
"Management's Discussion and Analysis of Financial Condition and Results of Operations" includes the following information:
•"Overview" provides a description of each Registrant's business strategy and a discussion of important financial and operational developments.
•"Results of Operations" for all Registrants includes a "Statement of Income Analysis," which discusses significant changes in principal line items on the Statements of Income, comparing 2025 with 2024. For PPL, "Results of Operations" also includes "Segment Earnings," which provides a detailed analysis of earnings by reportable segment. These discussions include the non-GAAP financial measure "Earnings from Ongoing Operations" and provide an explanation of the non-GAAP financial measure and a reconciliation of the measure to the most comparable GAAP measure.
•"Financial Condition - Liquidity and Capital Resources" provides an analysis of the Registrants' liquidity positions and credit profiles. This section also includes a discussion of forecasted sources and uses of cash and rating agency actions.
•"Financial Condition - Risk Management" provides an explanation of the Registrants' risk management programs relating to market and credit risk.
•"Application of Critical Accounting Policies" provides an overview of the accounting policies that are particularly important to the results of operations and financial condition of the Registrants and that require their management to make significant estimates, assumptions and other judgments of inherently uncertain matters.
For comparison of the Registrants' results of operations and cash flows for the years ended December 31, 2024 to December 31, 2023, refer to "Item 7. Combined Management's Discussion and Analysis of Financial Condition and Results of Operations" in the 2024 Form 10-K, filed with the SEC on February 13, 2025.
Overview
For a description of the Registrants and their businesses, see "Item 1. Business."
Business Strategy (All Registrants)
PPL operates four regulated utilities located in Pennsylvania, Kentucky and Rhode Island. Each of these jurisdictions has distinct regulatory structures and each of the utilities has distinct customer classes.
PPL's strategy, which is supported by the other Registrants and subsidiaries, is focused on creating the utilities of the future to drive greater value for our customers and shareowners. Key objectives in support of this strategy include:
•Strengthening the reliability and resilience of our electric and gas networks to improve service and protect against current and future weather and storms.
•Advancing a cleaner energy future affordably and reliably. This includes expanding and modernizing our generation with natural gas, renewables and battery storage, while supporting research and development of low-carbon solutions.
•Driving operational efficiencies to improve customer service and help keep energy affordable.
31
•Utilizing artificial intelligence and other advanced technologies to inform decision making, optimize asset planning and maintenance and better manage supply and demand on the grid.
•Empowering customers through expanded digital options and improved service.
•Engaging with key stakeholders to strengthen resource adequacy, power economic development, and support the growth and success of the regions we serve.
This strategy supports our mission to provide safe, affordable, reliable and sustainable energy to our customers and competitive, long-term returns to shareowners.
Financial and Operational Developments
Joint Venture Agreement with Blackstone Infrastructure (PPL)
PPL and Blackstone Infrastructure have created a joint venture to build, own and operate new electricity generation stations to power data centers in Pennsylvania under long-term energy services agreements (ESAs) to address underlying resource adequacy and affordability concerns in Pennsylvania and PJM more broadly. Construction of new generation stations will require the execution of ESAs with data center developers, including hyperscalers, or the regulated utilities in Pennsylvania. PPL owns 51% of the joint venture interest and Blackstone Infrastructure owns 49%. The joint venture is actively engaged with hyperscalers, landowners, natural gas pipeline companies and turbine manufacturers, and has secured multiple land parcels to enable this new generation build out; however, no ESAs with hyperscalers have been signed as of the filing date of this Form 10-K.
Regulatory Requirements
(All Registrants)
The Registrants cannot predict the impact that future regulatory requirements may have on their financial condition or results of operations.
Rate Case Proceedings
(PPL)
On November 26, 2025, RIE filed a request with the RIPUC for an increase in electric and natural gas base distribution rates, and approval of certain regulatory and accounting treatments. In its application, RIE seeks to implement a two-year rate plan. In the first year of the rate plan, RIE's proposed base distribution rates for electric and gas combined are designed to collect additional operating revenue of approximately $181 million ($66 million or 18.2% in electricity revenues and $115 million or 36.4% in gas revenues). In the second year of the rate plan, RIE's proposed base distribution rates for electric and gas combined are designed to collect the proposed base distribution rate increases for electric and gas in the first year of the rate plan and additional operating revenues of approximately $49 million ($17 million or 3.6% in electricity revenues and $32 million or 7.4% in gas revenues).
The application is based on a historical test year of September 1, 2024 through August 31, 2025 and requested an authorized ROE of 10.75%. Subject to RIPUC approval, new rates are expected to become effective on September 1, 2026. Certain counterparties have intervened in the proceeding. A ruling from the RIPUC is anticipated during the third quarter of 2026. PPL cannot predict the outcome of the proceeding.
See "Regulatory Matters – Rhode Island Activities – Hold Harmless Implementation Agreement" in Note 7 to the Financial Statements for discussion on an additional rate making initiative to mitigate customer rate impacts.
(PPL and PPL Electric)
On September 30, 2025, PPL Electric filed a request with the PAPUC for an increase in distribution base rates of approximately $356 million, more than $50 million of which is already included in customer bills through rate recovery mechanisms, and approval of certain regulatory and accounting treatments. The proposed increase in distribution base rates would increase PPL Electric's total annual revenue by approximately 8.6%. The application is based on a fully projected future test year of July 1, 2026 through June 30, 2027 and requested an authorized ROE of 11.3%. Subject to PAPUC approval, new rates are expected to become effective on July 1, 2026. Certain counterparties have intervened in the proceeding. A ruling from the PAPUC is anticipated during the second quarter of 2026. PPL and PPL Electric cannot predict the outcome of the proceeding.
32
(PPL, LG&E and KU)
On May 30, 2025, LG&E and KU filed requests with the KPSC for an increase in annual electricity and gas revenues of approximately $391 million ($105 million and $226 million in electricity revenues at LG&E and KU and $60 million in gas revenues at LG&E) and approval of certain regulatory and accounting treatments. The revenue increases would be an increase of 8.3% and 11.5% in electricity revenues at LG&E and KU, and an increase of 14.0% in gas revenues at LG&E.
The applications were based on a forecasted test year of January 1, 2026 through December 31, 2026 and requested an authorized ROE of 10.95%. New interim rates became effective on January 1, 2026, subject to refund pursuant to the KPSC's final order. Certain counterparties have intervened in the proceedings.
On October 20, 2025, LG&E and KU filed with the KPSC a stipulation and recommendation (the agreement) regarding a proposed resolution of issues with a majority of the intervenors in the proceedings.
Under the agreement, the parties proposed that the KPSC should issue orders granting a revised increase in annual electricity and gas revenues of approximately $235 million ($58 million and $132 million in electricity revenues at LG&E and KU and $45 million in gas revenues at LG&E.) The agreement proposed a revised authorized ROE of 9.90%.
The agreement proposed a "stay out" commitment from LG&E and KU to refrain from effective base rate increases before August 1, 2028, subject to certain exceptions. In connection with the stay out period, the agreement also proposed the establishment of two new rate adjustment clause mechanisms, a Generation Cost Recovery Adjustment Clause (GCR) and a Sharing Mechanism Adjustment Clause (SM).
The proposed GCR mechanism would provide LG&E and KU recovery of and return on investment of covered costs (excluding fuel amounts, which LG&E and KU can recover via an existing rate mechanism) of relevant new generation and energy storage assets authorized in the 2022 and 2025 CPCN proceedings (excluding the Mill Creek Unit 6 NGCC, see "2025 CPCN" for more information regarding the Mill Creek Unit 6 NGCC) as they are placed in service.
The proposed SM mechanism would address any base rate revenue deficiency or surplus during the final thirteen months of the stay out period, July 2027 through July 2028, below or above a suggested ROE band of 9.40% to 10.15%. Any such base rate revenue deficiency or surplus would be collected from or returned to customers over a thirteen-month billing period beginning November 2028.
Following issuance of the 2025 CPCN Order, LG&E and KU filed supplemental testimony with the KPSC in the rate case proceedings seeking recovery of the Mill Creek Unit 2 stay open costs through a proposed additional rate adjustment clause mechanism.
The agreement further proposed that LG&E and KU use regulatory deferral accounting for actual expenses above or below base rate levels for certain expenses including: pension and post-retirement benefits, storm restoration, vegetation management, transmission waivers and credits, and gas line or well activities, with recovery of such deferred asset or liability amounts to be addressed in future rate cases.
On February 16, 2026, the KPSC issued orders approving portions of the October 2025 stipulation and recommendation, with modifications.
The KPSC orders provide for increases in annual electricity and gas revenues of $233 million ($59 million and $128 million in electricity revenues at LG&E and KU and $46 million in gas revenues at LG&E.) The orders include authorized returns on equity of 9.775% for base rate purposes and 9.675% for capital rate adjustment mechanisms.
The KPSC orders approve LG&E's and KU's requests for establishment of certain new rate adjustment mechanisms or tariffs, with modifications:
• a temporary Pilot Generation Recovery Adjustment Clause (PGR) to provide recovery of and return on investment of applicable costs of certain new generation and storage assets being built or anticipated to be built by LG&E and KU as authorized in the 2022 CPCN proceeding;
• the inclusion in the PGR of recovery of and return on investment of certain costs associated with a potential extension of the operating life of LG&E's Mill Creek Unit 2 beyond its original 2027 retirement date; and
• an Extremely High Load Factor Tariff for future applicable customers, such as data centers, which includes requirements such as long-term contracts, minimum revenue payments and collateral security structures that help protect the interests of LG&E, KU and of other ratepayers.
33
The PGR mechanism is similar to the GCR proposed in the stipulation, but restructured by the KPSC to be a pilot adjustment mechanism with a term until the earlier of ten months following the submission of LG&E's and KU's next base rate proceeding or the effective date of new rates in such proceeding, with the expectation that the mechanism would be reviewed in such proceeding. The pilot mechanism will apply to the planned Mill Creek Unit 5, Brown Battery Energy Storage System, Mercer County Solar and Marion County Solar generation-related projects. The KPSC also included Mill Creek Unit 2's potential stay-open costs in the PGR in lieu of approving the stipulation's request for a stand-alone adjustment mechanism for such costs. Finally, the KPSC excluded from coverage under the PGR costs related to Mill Creek Unit 6 and Brown Unit 12 planned new generation assets due to their anticipated in-service dates falling outside of the estimated pilot mechanism's duration, but without prejudice to LG&E and KU seeking recovery of such costs in future proceedings.
The KPSC orders also approved, approved with modifications, or denied in some cases, other requested accounting and rate matters relating to regulatory assets or liabilities, depreciation rates, and other areas.
The rate changes have a retroactive effective date as of January 1, 2026. Consistent with authorized rate case procedures, LG&E and KU will refund to customers amounts billed in excess of the final approved rates within sixty days.
The KPSC orders did not approve the SM adjustment clause that had been requested in the stipulation and made no modifications to the stay out offer by LG&E and KU to refrain from effective base rate increases prior to August 2028.
LG&E and KU and all intervenors have rights to request rehearing or appeal of the orders of the KPSC and because the KPSC orders modified or denied terms of the proposed stipulation, LG&E and KU and all stipulating parties have the right to withdraw from the stipulation.
LG&E and KU continue to evaluate the details contained in the orders and related matters as they consider next steps. PPL, LG&E and KU cannot predict the outcome of this matter.
In addition, pursuant to prior orders of the KPSC, the LG&E and KU rate case application included an assessment of a potential legal merger of LG&E and KU and concluded a legal merger may be appropriate. On December 30, 2025, LG&E filed a joint update with KU in the rate case proceedings stating that it expects to file necessary applications for merger approval in mid-2026 with the KPSC. Ultimately, formal approval for a merger would be required from the KPSC, VSCC and FERC via subsequent regulatory applications.
(PPL, LG&E and KU)
Environmental Considerations for Coal-Fired Generation
The businesses of LG&E and KU are subject to extensive federal, state and local environmental laws, rules and regulations, including those pertaining to CCRs, GHG, and ELGs. See Notes 7, 12 and 18 to the Financial Statements for a discussion of these significant environmental matters. These and other environmental requirements led PPL, LG&E and KU to retire approximately 1,500 MW of coal-fired generating plants in Kentucky since 2010. As part of the long-term generation planning process, LG&E and KU evaluate a range of factors including the impact of potential stricter environmental regulations, fuel price scenarios, the cost of replacement generation, continued operations and major maintenance costs and the risk of major equipment failures in determining when to retire generation assets.
As a result of environmental requirements and aging infrastructure, LG&E has sought and obtained approval to retire two older coal-fired units at the Mill Creek Plant. Mill Creek Unit 1, with 300 MW of capacity, was retired in 2024. Mill Creek Unit 2, with 297 MW of capacity, was approved to be retired in 2027, subject to certain conditions. On October 28, 2025, in LG&E and KU's 2025 CPCN proceeding, the KPSC declined to rule on a request to extend the operation of Mill Creek Unit 2. The KPSC indicated that a request for a new retirement approval proceeding may be required should LG&E elect to operate Mill Creek Unit 2 beyond its existing approved retirement date and seek to later retire the unit. See "Rate Case Proceedings" in Note 7 to the Financial Statements for additional information.
On October 4, 2024, LG&E submitted an application related to the retirement of Mill Creek Unit 1, which occurred on December 31, 2024, requesting recovery of associated costs under the RAR. On February 24, 2025, the KPSC issued an order approving LG&E's cost recovery for Mill Creek Unit 1 under the RAR of $125 million and related amounts were included in bills beginning in May 2025. See Note 7 to the Financial Statements for additional information on the Mill Creek Unit 1 RAR.
34
2025 CPCN
On February 28, 2025, LG&E and KU filed an application with the KPSC regarding certain future plans for new generation and generation-related construction matters. The proposals included in the application were intended to serve anticipated load growth, including from potential data center demand in LG&E's or KU's service territory. The proposals did not include retirements of coal or other fossil-fueled plants, which would require additional KPSC approval procedures under Kentucky legislation enacted in 2023 and 2024.
LG&E and KU submitted a joint application to the KPSC for approval of certain certificates of public convenience and necessity, site compatibility certificates, and accounting treatment, where applicable, relating to a number of generation-related plans or projects that generally are expected to become operational or established within the next six years. The aggregate projected capital expenditures associated with these proposals were expected to be $3.7 billion. The application included proposals to build:
•a 645 MW NGCC generation unit at KU's E.W. Brown station (Brown Unit 12),
•a 645 MW NGCC generation unit at LG&E's Mill Creek station (Mill Creek Unit 6),
•a four-hour 400 MW (1600 MWh total) battery energy storage system (BESS) at LG&E's Cane Run station, and
•a selective catalytic reduction (SCR) environmental facility at KU's Ghent station Unit 2 (Ghent Unit 2).
The new NGCC units are anticipated to be wholly owned by LG&E and the BESS unit jointly owned by LG&E (32%) and KU (68%), with actual project costs allocated consistent with LG&E's and KU's ultimate ownership shares and existing shared dispatch, cost allocation, tariff or other frameworks. The proposed Mill Creek Unit 6 NGCC is in addition to a new NGCC unit currently under construction at that location (Mill Creek Unit 5).
The filing also noted projected in service dates for the projects, including the Brown Unit 12 NGCC in 2030, the Mill Creek Unit 6 NGCC in 2031, the Cane Run BESS in 2028 and the Ghent Unit 2 SCR in 2028.
On July 29, 2025, LG&E and KU filed with the KPSC a stipulation and recommendation regarding a proposed resolution of issues with several of the intervenors in the CPCN proceeding (stipulation). The stipulation recommended to the KPSC the approval of the large majority of LG&E's and KU's requested generation-related projects and associated accounting matters, subject to certain changes. Under the stipulation, the parties agreed the KPSC should issue an order granting a CPCN for the proposed: (a) Brown Unit 12 NGCC; (b) Mill Creek Unit 6 NGCC; and (c) Ghent Unit 2 SCR. In addition, the proposal to build the $775 million Cane Run BESS would be withdrawn without prejudice, the relevant costs regarding the proposed $1.4 billion Mill Creek Unit 6 NGCC would be recovered through a new rate adjustment clause mechanism, the retirement date for the existing Mill Creek Unit 2 coal unit would be extended from 2027 to the operational date of the proposed Mill Creek Unit 6 NGCC or afterwards, subject to relevant future economic analysis, regulatory or environmental authorizations, and the relevant costs to continue to operate the Mill Creek Unit 2 coal unit would be recovered through a new rate adjustment clause mechanism. The stipulation also contained provisions relating to regulatory asset accounting, proposed data center tariffs, future renewable power requests-for-proposals and other matters. LG&E and KU would retain the right to seek approval of the potentially withdrawn Cane Run BESS or similar substitute project in future regulatory proceedings.
On October 28, 2025, the KPSC issued an order approving much of LG&E's and KU's July 2025 stipulation, with certain modifications. The order granted the requested CPCNs and site-related permits to construct the proposed Brown Unit 12 NGCC, Mill Creek Unit 6 NGCC, and Ghent Unit 2 SCR. The order authorized inclusion of relevant costs of the Ghent Unit 2 SCR in KU's existing environmental cost recovery rate mechanism. The order established a separate monitoring case to receive and consider information during the construction of Mill Creek Unit 6 NGCC.
The order approved requests regarding regulatory asset deferral accounting treatment for certain AFUDC related amounts and noted the KPSC's expectation that the stipulating parties would follow through with their commitments regarding tariffs and power supply contracts related to potential future data center or high load customers in LG&E's and KU's pending rate proceedings. The order also approved other elements of the stipulation or the originally-filed application, with minor modifications.
35
The KPSC decided not to approve LG&E's and KU's proposed new rate adjustment cost recovery mechanisms for certain costs associated with Mill Creek Unit 6 NGCC and costs associated with operating the Mill Creek Unit 2 coal plant beyond its original retirement date in 2027. However, the denials were without prejudice to resubmission and the KPSC encouraged the parties to provide additional evidence on such matters in separate proceedings. LG&E and KU provided such evidence addressing recovery of the Mill Creek Unit 2 stay open costs in their pending rate case proceedings. Recovery of Mill Creek Unit 6 costs will be addressed in a future proceeding. The KPSC declined to rule on the matter related to the retirement date of Mill Creek Unit 2 coal plant. The KPSC indicated that a request for a new retirement approval proceeding may be required should LG&E elect to operate Mill Creek Unit 2 beyond its existing approved retirement date and seek to later retire the unit.
In light of the conditional withdrawal in the stipulation, the order did not include a CPCN for the Cane Run BESS. LG&E and KU retain the right to seek approval of the Cane Run BESS project or similar substitute projects at any time in future regulatory proceedings.
FERC Transmission Rate Filing
In 2018, LG&E and KU applied to the FERC requesting elimination of certain on-going waivers and credits to a sub-set of transmission customers relating to the 1998 merger of LG&E's and KU's parent entities and the 2006 withdrawal of LG&E and KU from the Midcontinent Independent System Operator, Inc. (MISO), a regional transmission operator and energy market. The application sought termination of LG&E's and KU's commitment to provide certain Kentucky municipalities mitigation for certain horizontal market power concerns arising out of the 1998 LG&E and KU merger and 2006 MISO withdrawal. The amounts at issue are generally waivers or credits granted to a limited number of Kentucky municipalities for either certain LG&E and KU or MISO transmission charges incurred for transmission service received. In 2019, the FERC granted LG&E's and KU's request to remove the ongoing credits, conditioned upon the implementation by LG&E and KU of a transition mechanism for certain existing power supply arrangements, which was subsequently filed, modified, and approved by the FERC in 2020 and 2021. In 2020, LG&E and KU and other parties filed appeals with the U.S. Court of Appeals - D.C. Circuit (D.C. Circuit Court of Appeals) regarding the FERC's orders on the elimination of the mitigation and required transition mechanism. In August 2022, the D.C. Circuit Court of Appeals issued an order remanding the proceedings back to the FERC. On May 18, 2023, the FERC issued an order on remand reversing its 2019 decision and requiring LG&E and KU to refund credits previously withheld, including under such transition mechanism. LG&E and KU filed a petition for review of the FERC's May 18, 2023 order with the D.C. Circuit Court of Appeals and provided refunds in accordance with the FERC order on December 1, 2023. The FERC issued an order on LG&E's and KU's compliance filing on November 16, 2023, and LG&E and KU filed a petition for review of this November 16, 2023 order on February 14, 2024. The FERC issued the substantive order on rehearing on March 21, 2024, reaffirming its prior decision. On August 8, 2025, the D.C. Circuit Court of Appeals issued a procedural ruling vacating the FERC's prior orders and remanded the matter back to the FERC for further proceedings. LG&E and KU cannot predict the ultimate outcome of the proceedings or any other post decision process but do not expect the annual impact to have a material effect on their operations or financial condition. LG&E and KU currently receive recovery of certain waivers and credits primarily through existing base rate levels.
(PPL)
Hold Harmless Implementation Agreement
As a condition of its approval of the acquisition of RIE in May 2022, the Rhode Island Division of Public Utilities and Carriers required PPL to hold harmless Rhode Island customers from the impact of future rate increases resulting from changes in Accumulated Deferred Income Taxes as a result of the Acquisition (the Hold Harmless Commitment). On June 13, 2025, an agreement was entered into by and among RIE, PPL, PPL Rhode Island Holdings and the Rhode Island Division of Public Utilities and Carriers Advocacy Section (the Hold Harmless Implementation Agreement) to satisfy the Hold Harmless Commitment by providing approximately $155 million in miscellaneous bill credits issued to customers, with approximately $74 million to be issued in the first quarter of 2026 and approximately $81 million to be issued in the first quarter of 2027. The bill credits would be recorded as a reduction to revenue in the periods in which the credits are applied to customers' bills. On September 10, 2025, the Rhode Island Division of Public Utilities and Carriers issued an order confirming that RIE's provision of proposed miscellaneous bill credits as set forth in the Hold Harmless Implementation Agreement would satisfy the Hold Harmless Commitment. Also on September 10, 2025, the RIPUC opened a docket to evaluate the miscellaneous bill credit proposal set forth in the Hold Harmless Implementation Agreement, including the underlying rate accounting, and required RIE to file a tariff advice with the RIPUC, which RIE filed on October 2, 2025. After responding to discovery in that proceeding and before the evidentiary hearing was held or convened, RIE filed a notice of withdrawal of its tariff advice filing noting that it would hold in abeyance a comprehensive satisfaction of the Hold Harmless Commitment at this time. As a result of RIE's filing the notice of withdrawal, the Commission cancelled the evidentiary hearing. The docket remains open, but there has been no further activity since RIE's withdrawal of the tariff advice and the RIPUC's cancellation of the evidentiary hearing. PPL cannot predict whether there will be any further proceedings on the docket or the outcome of any further proceedings that may occur.
36
Winter Bill Volatility Docket
At an Open Meeting on November 24, 2025, the RIPUC approved several measures to help mitigate winter bill increases for electric customers. First, the RIPUC approved miscellaneous bill credits for all residential electric customers of $23.54 per month for January, February, and March 2026. Second, the RIPUC paused the Storm Fund Replenishment Factor for usage on and after January 1, 2026, subject to further review through the 2026 Annual Retail Rate Filing. Third, the RIPUC paused the electric Energy Efficiency Charge for usage beginning January 1, 2026 through March 31, 2026. To offset the costs of the miscellaneous bill credits, the RIPUC directed RIE to apply the December 31, 2025 electric Energy Efficiency fund balance, net of any earned incentives, and directed RIE to transfer $11 million from the storm fund balance. The RIPUC approved future cost recovery for RIE of any unfunded balance of the miscellaneous bill credits through future identified offsets and/or a reconciling recovery mechanism to be determined in conjunction with the 2026 electric retail rate filing to allow recovery by December 31, 2026. Any remaining unfunded balance shall accrue at RIE's weighted average cost of capital.
FY 2027 Gas ISR Plan
On December 22, 2025, RIE filed its FY 2027 Gas ISR Plan with the RIPUC with a budget of $184 million that primarily included $166 million of capital investment spend and $17 million for spending on curb-to-curb paving. A decision from the RIPUC on the Plan is expected by March 31, 2026. RIE cannot predict the outcome of this matter.
FY 2027 Electric ISR Plan
On December 22, 2025, RIE filed its FY 2027 Electric ISR Plan with the RIPUC with a budget that primarily included $154 million of capital investment spend (including $18 million for Advanced Metering Functionality) and $13 million of vegetation operation and maintenance spend. A decision from the RIPUC is expected by March 31, 2026. RIE cannot predict the outcome of this matter.
DSIC Petition (PPL and PPL Electric)
On April 26, 2024, PPL Electric filed a Petition with the PAPUC requesting that the PAPUC waive PPL Electric's DSIC cap of 5% of billed revenues and increase the maximum allowable DSIC to 9% for bills rendered on or after January 1, 2025. On February 28, 2025, the PAPUC issued its written order permitting PPL Electric to increase its DSIC cap from 5% to 7.5% for bills rendered on or after March 13, 2025 until the effective date of rates established in PPL Electric's next base rate case or the end of the PPL Electric's 2023-2027 Long-term Infrastructure Improvement Plan, whichever occurs first, at which time it will return to 5%.
Results of Operations
(PPL)
The "Statement of Income Analysis" discussion below describes significant changes in principal line items on the Statements of Income, comparing 2025 with 2024. The "Segment Earnings" discussions provide a review of results by reportable segment. These discussions include the non-GAAP financial measure "Earnings from Ongoing Operations" and provide an explanation of the non-GAAP financial measure and a reconciliation of the measure to the most comparable GAAP measure.
(PPL Electric, LG&E and KU)
A "Statement of Income Analysis" is presented separately for PPL Electric, LG&E and KU. The "Statement of Income Analysis" discussion below describes significant changes in principal line items on the Statements of Income, comparing 2025 with 2024. The results of operations section for PPL Electric, LG&E and KU is presented in a reduced disclosure format in accordance with General Instructions (I)(2)(a) of Form 10-K.
37
PPL: Statement of Income Analysis and Segment Earnings
Statement of Income Analysis
Net income for the years ended December 31 includes the following results:
| Change | |||||||||||||||
| 2025 | 2024 | 2025 vs. 2024 | |||||||||||||
| Operating Revenues | $ | 9,042 | $ | 8,462 | $ | 580 | |||||||||
| Operating Expenses | |||||||||||||||
| Operation | |||||||||||||||
| Fuel | 855 | 783 | 72 | ||||||||||||
| Energy purchases | 1,892 | 1,679 | 213 | ||||||||||||
| Other operation and maintenance | 2,431 | 2,607 | (176) | ||||||||||||
| Depreciation | 1,312 | 1,279 | 33 | ||||||||||||
| Taxes, other than income | 423 | 374 | 49 | ||||||||||||
| Total Operating Expenses | 6,913 | 6,722 | 191 | ||||||||||||
| Operating Income | 2,129 | 1,740 | 389 | ||||||||||||
| Other Income (Expense) - net | 151 | 114 | 37 | ||||||||||||
| Interest Expense | 808 | 738 | 70 | ||||||||||||
| Income Before Income Taxes | 1,472 | 1,116 | 356 | ||||||||||||
| Income Taxes | 291 | 228 | 63 | ||||||||||||
| Net Income | $ | 1,181 | $ | 888 | $ | 293 | |||||||||
Operating Revenues
The increase (decrease) in operating revenues was due to:
| 2025 vs. 2024 | |||||
| PPL Electric distribution volumes (a) | $ | 34 | |||
| PPL Electric PLR (b) | 174 | ||||
| PPL Electric transmission formula rate (c) | 45 | ||||
| LG&E volumes (d) | 15 | ||||
| LG&E fuel and other energy purchases (e) | 67 | ||||
| LG&E off-system sales (f) | 11 | ||||
| KU volumes (d) | 34 | ||||
| KU fuel and other energy purchases (g) | 31 | ||||
| KU off-system sales (f) | 18 | ||||
| RIE energy purchases and other recoveries (h) | 140 | ||||
| RIE capital investment | 20 | ||||
| Other | (9) | ||||
| Total | $ | 580 | |||
(a)The increase was primarily due to weather and higher other usage in 2025.
(b)The increase was primarily due to higher energy prices, more PLR customers and higher customer volumes due to weather and other higher usage.
(c)The increase was primarily due to returns on additional transmission capital investments and return of depreciation expense.
(d)The increases were primarily due to weather.
(e)The increase was primarily due to higher recoveries of fuel expenses and energy purchases.
(f)The increases were primarily due to higher volumes.
(g)The increase was primarily due to higher recoveries of fuel expenses.
(h)The increase was primarily due to higher recoveries of energy purchases primarily due to net metering credits, transmission expenses and gross earnings taxes
Fuel
Fuel expense increased $72 million in 2025 compared with 2024, primarily due to a $40 million increase in commodity costs and a $32 million increase in volumes due to weather.
38
Energy Purchases
The increase (decrease) in energy purchases was due to:
| 2025 vs. 2024 | |||||
| PPL Electric PLR volumes | $ | 57 | |||
| PPL Electric PLR prices | 92 | ||||
| LG&E commodity costs | 14 | ||||
| LG&E volumes | 23 | ||||
| RIE net metering | 19 | ||||
| Other | 8 | ||||
| Total | $ | 213 | |||
Other Operation and Maintenance
The increase (decrease) in other operation and maintenance was due to:
| 2025 vs. 2024 | |||||
| PPL Electric DER projects impairment (a) | $ | (21) | |||
| PPL Electric vegetation management expenses | (14) | ||||
| PPL Electric bad debt expenses | (21) | ||||
| PPL Electric storm expenses | (13) | ||||
| RIE gas maintenance expenses | 25 | ||||
| RIE transmission expenses | 62 | ||||
| RIE integration related expenses (b) | (57) | ||||
| RIE customer service expenses | 27 | ||||
| RIE pension alignment (c) | 22 | ||||
| IT costs (d) | 76 | ||||
| Transition costs associated with RIE (e) | (236) | ||||
| Other | (26) | ||||
| Total | $ | (176) | |||
(a)2024 impairment of DER project costs associated with a pilot solar program for which PPL will not seek regulatory recovery.
(b)Certain transition services agreement costs in 2024 for IT systems that will not be part of PPL's ongoing operations.
(c)The increase is primarily due to a reclassification of the pension adjustment mechanism to align with PPL's accounting for other revenue related recovery items.
(d)Primarily costs associated with PPL's restructuring and rebuilding of its IT infrastructure, organization and systems.
(e)See Note 9 to the Financial Statements for additional information.
Interest Expense
The increase (decrease) in interest expense was due to:
| 2025 vs. 2024 | |||||
| Long-term debt (a) | $ | 47 | |||
| Short-term debt | 13 | ||||
| Other | 10 | ||||
| Total | $ | 70 | |||
(a)The increase was primarily due to increased borrowings, partially offset by debt extinguishment gains resulting from affiliated debt repurchases. See Note 8 to the Financial Statements for additional information.
39
Income Taxes
The increase (decrease) in income taxes was due to:
| 2025 vs. 2024 | |||||
| Federal tax on change in pre-tax income | $ | 75 | |||
| State income taxes | 8 | ||||
| Income tax credits | (8) | ||||
| Amortization of (excess)/deficient deferred taxes | (5) | ||||
| AFUDC Equity | (10) | ||||
| Other | 3 | ||||
| Total | $ | 63 | |||
See Note 6 to the Financial Statements for additional information on income taxes.
Segment Earnings
PPL's Net Income (Loss) by reportable segments was as follows:
| Change | |||||||||||||||
| 2025 | 2024 | 2025 vs. 2024 | |||||||||||||
| Kentucky Regulated | $ | 674 | $ | 620 | $ | 54 | |||||||||
| Pennsylvania Regulated | 639 | 574 | 65 | ||||||||||||
| Rhode Island Regulated | 85 | 109 | (24) | ||||||||||||
| Corporate and Other (a) | (217) | (415) | 198 | ||||||||||||
| Net Income (Loss) | $ | 1,181 | $ | 888 | $ | 293 | |||||||||
(a)Primarily represents financing and certain other costs incurred at the corporate level that have not been allocated or assigned to the segments, which are presented to reconcile segment information to PPL's consolidated results.
Earnings from Ongoing Operations
Management utilizes "Earnings from Ongoing Operations" as a non-GAAP financial measure that should not be considered as an alternative to net income, an indicator of operating performance determined in accordance with GAAP. PPL believes that Earnings from Ongoing Operations is useful and meaningful to investors because it provides management's view of PPL's earnings performance as another criterion in making investment decisions. In addition, PPL's management uses Earnings from Ongoing Operations in measuring achievement of certain corporate performance goals, including targets for certain executive incentive compensation. Other companies may use different measures to present financial performance.
Earnings from Ongoing Operations is adjusted for the impact of special items. Special items are presented in the financial tables on an after-tax basis with the related income taxes on special items separately disclosed. Income taxes on special items, when applicable, are calculated based on the statutory tax rate of the entity where the activity is recorded. Special items may include items such as:
• Gains and losses on sales of assets not in the ordinary course of business.
• Impairment charges.
• Significant workforce reduction and other restructuring effects.
• Acquisition and divestiture-related adjustments.
• Other charges or credits that are, in management's view, non-recurring or otherwise not reflective of the company's ongoing operations.
40
PPL's Earnings from Ongoing Operations by reportable segment were as follows:
| Change | |||||||||||||||
| 2025 | 2024 | 2025 vs. 2024 | |||||||||||||
| Kentucky Regulated | $ | 693 | $ | 624 | $ | 69 | |||||||||
| Pennsylvania Regulated | 640 | 607 | 33 | ||||||||||||
| Rhode Island Regulated | 142 | 155 | (13) | ||||||||||||
| Corporate and Other | (131) | (136) | 5 | ||||||||||||
| Earnings from Ongoing Operations | $ | 1,344 | $ | 1,250 | $ | 94 | |||||||||
See "Reconciliation of Earnings from Ongoing Operations" below for a reconciliation of this non-GAAP financial measure to Net Income.
Kentucky Regulated Segment
The Kentucky Regulated segment consists primarily of LG&E's and KU's regulated electricity generation, transmission and distribution operations, as well as LG&E's regulated distribution and sale of natural gas.
Net Income and Earnings from Ongoing Operations include the following results:
| Change | |||||||||||||||
| 2025 | 2024 | 2025 vs. 2024 | |||||||||||||
| Operating Revenues | $ | 3,760 | $ | 3,562 | $ | 198 | |||||||||
| Fuel | 855 | 783 | 72 | ||||||||||||
| Energy purchases | 214 | 176 | 38 | ||||||||||||
| Other operation and maintenance | 818 | 803 | 15 | ||||||||||||
| Depreciation | 717 | 710 | 7 | ||||||||||||
| Taxes, other than income | 102 | 99 | 3 | ||||||||||||
| Total Operating Expenses | 2,706 | 2,571 | 135 | ||||||||||||
| Other Income (Expense) - net | 53 | 29 | 24 | ||||||||||||
| Interest Expense | 264 | 240 | 24 | ||||||||||||
| Income Taxes | 169 | 160 | 9 | ||||||||||||
| Net Income | 674 | 620 | 54 | ||||||||||||
| Less: Special Items | (19) | (4) | (15) | ||||||||||||
| Earnings from Ongoing Operations | $ | 693 | $ | 624 | $ | 69 | |||||||||
The following after-tax gains (losses), which management considers special items, impacted the Kentucky Regulated segment's results and are excluded from Earnings from Ongoing Operations:
| Income Statement Line Item | 2025 | 2024 | |||||||||||||
FERC transmission credit refund, net of tax of $0 (a) | Operating Revenues | $ | — | $ | 1 | ||||||||||
ECR beneficial reuse transition adjustment, net of tax of $2 (b) | Operating Revenues | — | (4) | ||||||||||||
Strategic corporate initiatives, net of tax of $0 (c) | Other operation and maintenance | — | (1) | ||||||||||||
IT transformation, net of tax of $5 (d) | Other operation and maintenance | (16) | — | ||||||||||||
Office relocation and related costs, net of tax of $1 (e) | Other operation and maintenance | (3) | — | ||||||||||||
| Total | $ | (19) | $ | ||||||||||||
Recent insider activity
| Date | Insider | Role | Action | Shares | Price | Value |
|---|---|---|---|---|---|---|
| 2026-06-12 | Cornett John Gregory | President of a PPL Subsidiary | Sell | -7,051 | $35.56 | -$250,734 |
Source: SEC Form 4 filings.
Next expected filings
- ~2026-07-30 10-Q expected by 2026-08-06 (in 1 day)
- ~2026-11-04 10-Q expected by 2026-11-11 (in 98 days)
- ~2027-02-19 10-K expected by 2027-03-05 (in 205 days)
- ~2027-05-07 10-Q expected by 2027-05-14 (in 282 days)
Predicted from historical filing cadence; not an SEC commitment.
Recent SEC filings
- 2026-06-30 8-K Officer/Director Change; Regulation FD Disclosure; Financial Statements and Exhibits
- 2026-06-04 8-K Other Events; Financial Statements and Exhibits
- 2026-05-18 8-K Material Agreement Entered; Material Financial Obligation; Financial Statements and Exhibits
- 2026-05-15 8-K Material Financial Obligation; Other Events; Financial Statements and Exhibits
- 2026-05-13 8-K Officer/Director Change; Shareholder Vote Results; Financial Statements and Exhibits
- 2026-05-13 S-8 Employee Benefit Plan Registration
- 2026-05-08 8-K Earnings Release; Regulation FD Disclosure; Financial Statements and Exhibits
- 2026-05-08 10-Q Quarterly Report
- 2026-03-24 8-K Other Events
- 2026-03-13 8-K Other Events; Financial Statements and Exhibits
- 2026-03-06 8-K Other Events
- 2026-02-26 8-K Material Agreement Entered; Financial Statements and Exhibits
- 2026-02-20 10-K Annual Report
- 2026-02-20 8-K Earnings Release; Regulation FD Disclosure; Financial Statements and Exhibits
- 2026-02-17 8-K Other Events